After passing the inspection of the welding process of the directly buried prefabricated insulation pipeline, the joint repair construction work shall be carried out without affecting the construction. Firstly, determine the basic parameters and construction regulations for the joint repair of directly buried prefabricated insulation pipes to ensure that there are no problems with the construction quality. The construction process of directly buried prefabricated insulation pipe joint repair is suitable for selecting conditions above 15C and humidity below 85%. Low temperature is not conducive
直埋式预制保温管道焊接环节检验合格后,在不影响施工的前提下,进行补口施工工作。先确定直埋式预制保温管补口基本参数和施工规程,确保施工质量不会出现问题。直埋式预制保温管补口施工过程适合选择在15C以上、湿度85%以下条件下进行,温度过低不利于聚氨酯发泡附着成型。